Automatyczne sprzęt jednoetapowy Precyzja formy ciśnieniowej

Forma do tłoczenia
December 15, 2025
Category Connection: Forma do tłoczenia
Brief: Nasz zespół pokaże wam, jak wykonuje się jednoetapowa forma do odlewu automatycznego w standardowych scenariuszach produkcji.pokazując swój projekt, specyfikacji materiałów i charakterystyki wydajności do tworzenia dostosowanych komponentów sprzętowych ATM.
Related Product Features:
  • Precision single-stage die mold designed for ATM hardware components with medium complexity.
  • Constructed from D2 Tool Steel with a hardness of 58-62 HRC for extended durability.
  • Maintains tight tolerances of ±0.02 mm for high-precision part production.
  • Features integrated cooling channels and a spring-loaded ejection system for efficient operation.
  • Surface treated with nitriding for enhanced wear resistance and longevity.
  • Manufactured according to ISO 9001:2015 standards ensuring quality and compliance.
  • Supports various materials including carbon steel, stainless steel, aluminum, copper, and brass.
  • Customizable design based on client specifications with a typical lead time of 4-6 weeks.
Pytania:
  • What materials can be used with this single-stage die mold?
    The mold is suitable for various materials including carbon steel, stainless steel, aluminum, copper, brass, and bronze, accommodating specific customer requirements.
  • What is the expected lifespan of this precision die casting mold?
    This mold is engineered for an expected lifespan of 100,000 cycles, ensuring long-term reliability for your production needs.
  • What quality control measures are implemented during manufacturing?
    We conduct 100% quality control inspection on each product and manufacture according to ISO 9001:2015 standards to ensure consistent quality and compliance.
  • How customizable is this die mold for specific client requirements?
    The mold can be fully customized based on client specifications, including dimensions and design features, with a standard lead time of 4-6 weeks for manufacturing.